Saturday, March 7, 2009

prototyping....

Prototyping allows the users to try out a working model of a system before the actual system is complete. Explain how prototyping can be counterproductive if it creates task interference during training.


A prototype typically simulates only a few aspects of the features of the final program, and may be completely different from the final implementation. The usual purpose of prototyping is to allow the users of the system to evaluate developers’ proposals for the design of the final product by essentially trying them out, rather than having to understand and assess the design based on descriptions. It can also be used by end users to describe and prove requirements that developers have not considered, so controlling the prototype can be a key factor in the commercial relationship between providers and their clients.

Prototyping can be a big help since when it is made software and implementer can obtain feedback from the user early in the project. It allows the software engineer some insight into the accuracy of initial project estimates and whether the deadlines and milestones proposed can be successfully met and if it matches the software specification.

Prototyping can improve the quality of requirements and specifications provided to developers. Because changes cost exponentially more to implement as they are detected later in development. Because the early determination of what the user really wants can result in faster and less expensive software.

But despite the fact that prototyping improves and increases user involvement it can somehow produce problems or difficulties instead of helping to achieve a goal especially when it creates task obstruction during training. It can create insufficient analysis since focusing on a limited prototype can distract developers from properly analyzing the complete project. This can lead to overlooking better solutions, preparation of incomplete specifications or the conversion of limited prototypes into poorly engineered final projects that are hard to maintain.

A key property to prototyping is the fact that it is supposed to be done quickly. If the developers lose sight of this fact, they very well may try to develop a prototype that is too complex. User can become stuck in debates over details of the prototype, holding up the development team and delaying the final project.

who is responsible if the component fails?

If one person has written a component but others have revised it, who is responsible if the component fails? What are the legal and ethical implications of reusing someone else’s component?

Some scenarios these days are copying others work with or without the authors’ knowhow. But sometimes it leads to failure of a component for the fact that incorrect revision takes place. First issue of incorrect revising is not getting the real idea of the original author. But who’s to be blame when such things happen? Is it in the side of the original author or the one who revised it? Sometimes we revised work in order for us to correct, update and improve the original text but usually we lack analysis and better perception of the point of the original component.

When we revised someone else’s component, we come to different conclusions and update previous estimate in order to make it more accurate or even realistic. But the fact that nothing ends up perfectly makes me apprehend that both of the two (less from the original author and more from the one who revised) are legally responsible for whatever failures occur. Considering the time when the component hasn’t revised yet, we don’t know if it is correctly written and can lead to more errors when revision takes place.

But unauthorized revising of someone else’s component has legal and ethical implications. They say that when a things has been done and done well, take it and copy it without hesitation. As people in a new generation we prefer to believe that improving someone’s work is much easier to do than doing it from scratch. However, revision of others component without the absence of making it perfectly done guarantees the originality of a thought.

Which of the following questions might be asked at the preliminary design review? At the critical design review?

You have been hired by a computer consulting firm to develop an income tax calculation package for an accounting firm. You have designed a system according to the customer’s requirements and presented your design at a design review. Which of the following questions might be asked at the preliminary design review? At the critical design review? At both? Explain your answers.

a) What computer will it run on?
b) What will the input screens look like?
c) What reports will be produced?
d) How many concurrent users will there be?
e) Will you use a multiuser operating system?
f) What are the details of the depreciation algorithm?


Under the design review procedures, some firms provide a preliminary and critical design review. In the preliminary design review, the possible questions that might be asked are those factors that need to be considered first in preparation for something of greater size and importance. This includes the physical environment in which locations, equipment functions and environmental restrictions are considered. Other than these are the interface or what will the input screens look alike. Will the input comes from one or more other systems? Is the output going to one or more other systems? Is there described way in which the data must be formatted and is there a prescribed medium that the data must be used?

In the both preliminary and critical design review, user and human factors such as who will use the system and will there be several types of user are also questions that need to be measured. Functionality, resources, security and quality assurance might also be asked. This will help in determining the several mode of operation and when will be the system be changed and enhanced. Skill level of every type of user and what training is required for each type of user are just few questions found in both preliminary and critical review. When you have designed a system you also need to know if how difficult would it be for a user to misuse the system and how easy will it be for the user to understand and use the system. Details of the depreciation algorithm will be asked in either critical or preliminary design review.
Designing a system according to the customer’s requirements are not enough, you need to consider some factors that will ensure the quality of the system.

How can we demonstrate the reliability of a system that is required never to fail?

Non-functional requirements describe the restriction of the system between systems that limits our choice for constructing a solution to the problem. In systems engineering, non-functional requirements are requirements that specify criteria that can be used to judge the operation of a system rather than specific behaviors. This defines how a system is supposed to be. But how can we demonstrate that these requirements are testable? How can we exhibit the reliability of a system that is required never to fail?

With computers becoming a highly factor nowadays, there is a decisive need to ensure that systems continue to function even when a component fails. The reliability of a system is the probability of failure-free software operation for a specified period of time in a particular environment. Identifying non-functional requirements are also an important factor affecting system reliability. Measurement in software is still in its infancy. No good quantitative methods have been developed to represent software reliability without excessive limitations. Various approaches can be used to improve the reliability of software.

With the advent of the computer age, computers, as well as the software running on them, are playing a vital role in our daily lives. We may not have noticed, but with a continuously lowering cost and improved control, processors and software controlled systems offer compact design, flexible handling, rich features and competitive cost. People used to believe that software never breaks. Without being proven to be wrong, optimistic people would think that once after the software can run correctly, it will be correct forever. A series of tragedies and chaos caused by software proves this to be wrong. These events will always have their place in history.

Software can make decisions, but can just as unreliable as human beings. Fixing problems may not necessarily make the software more reliable. On the contrary, new serious problems may arise. Once perfectly working software may also break if the running environment changes. This makes us wondering whether software is reliable at all, whether we should use software in safety-critical embedded applications.

Saturday, February 14, 2009

Mistakes may be made on the part of the software developers

Mistakes may be made on the part of the software developers or indeed may be made on the part of the entity requiring the software system. So who exactly is responsible when once a system is built and the system harms someone either physically or financially? In developing systems there are many problems that can result from faulty assumption or system failures which are perceptibly made by the development team. A system, which was developed by the collaboration of a costumer and the user, can encounter some important factors that are needed to ensure that the system would do well.

Since developer takes the biggest role in the making of the system, if anything happens, it is his responsibility. It is already by default that once you are a developer you have the great factor that is important contributor to a system failure.

Since some of the user is improperly trained then the likelihood of them making serious errors is increased due to their lack of knowledge of the system. When a system harms someone physically or financially, user should not be held reliable due to lack of training. A user and a costumer who makes a mistake should not be reprimanded for it if they have not been trained to deal with it. When a developer has made the user and costumer well-trained, then the end users will significantly reduce harms and improve the integrity of the systems.

The responsibility for failures caused by many factors falls squarely on the developer responsible for creating and maintaining the software system. As such measures to reduce poor development practices must center on the development team itself.

Project managers can increase their productivity in a variety of ways

Project managers can increase their productivity in a variety of ways. The most obvious methods involve automation and computerization which minimize the task that must be performed by employees. The growth of productivity – output per unit of input – is the fundamental determinant of the growth of a country’s material standard of living. The most commonly cited measures of productivity are in terms of a unit of size per unit of time. One cannot have sustained growth in output per person.

Regarding the first issue, measuring productivity in terms of number of lines is somehow futile. It is for the reason that different languages can produce different numbers of lines of code. Nowadays, as a programmer who always runs out of time, we typically make line of source codes shorter but concise to make it easier to decode and manage.

Productivity in lines of code cannot also be measured until an implementation starts. It is only generated during the implementation period. Measuring productivity through this kind of way can somehow take no notice of the other phases of development. Simply because we cannot identify its efficiency not until it’s implemented.

But, on the other hand, programmers may structure code to meet productivity goals ineffective because a programmer is already known on manipulating program making it more efficient.

Total productivity is a productivity measure that incorporates all the inputs required to make a product. Thus measuring productivity by means of lines of source codes are not an effective way but inputs could be grouped in several ways as long as they determine the total inputs required to produce an output.

Saturday, February 7, 2009

on a real scenario

On a real scenario, there are only very few software projects which are completed in time. As a student, we are trained to face and focus on what we need to know about risk in the pursuit of delivering software projects. Through this we are practicing our best techniques of risk analysis and to be able to develop the process for various organizations.

When we are in the midst of making a software project we always think a lot of risk like we cannot complete the system and will not meet its user needs. That is why we understand its function better than we could for a successful information system development. During the time of making “so called student projects” we face this kind of risk that has been consistently identified by all.

• Lack of Technical knowledge
Since we usually do the research we don’t have enough information for us to better implement our project effectively. And because we are just a simple student we don’t have enough will power to ask questions and help from the people whom we know has the knowledge.

• High cost of requirements
Being in a world with low cost of living, it is and always a problem for us to acquire high cost requirements. This one can also be the reason for project delay or even the worst.

• Time management
Since we don’t have all the time, making it ours is also a main problem. In a group we usually quarrel when managing our time schedule. Sometimes, since night time is the only moment we can gather ourselves together we usually end up making our projects in a sleepless night leading us to force our self doing projects overtime.

• Unpredictable changes and the lack of will to overcome it
As a student, we usually have the aura of being anxious when it becomes to dealing changes. We always keep on running to changes. In a real scenario, we typically lose self-esteem that we end up losing also our self confidence and the drive to finish project.

• Lack of comprehension
Misunderstanding between group members can also be determined as one of the major risk in making projects. We usually fail to understand or interpret something correctly. Minor disagreement can sometimes lead to project failure.



Since risk are everywhere we need to make it part of our own. If we are fugitive when we encounter it, if we have used our strength in fleeing it will surely prevail. But if we do the seeking we will be able to destroy it. If we want to cease being hunted, we must become the hunter.

changing requirements and employee turnover...a reason?

Changing requirements and employee turnover are widely perceived as one of the main reasons that a project will be late. It is a problem particularly experienced on a long design and development projects that needs to rework the designs to keep them in step with changes in the specifications or in the expectations of the clients.

Employee turnover is a ratio comparison of the number of employees a company must replace in a given time period to the average number of total employees. Wages, company benefits, employee attendance, and job performance are all factors that play a significant role in employee turnover. It can also be a factor that makes a project late because it changes number of staff either adding or losing personnel. It has proven to be one of the most costly and seemingly intractable human resource challenges confronting organizations.

Changing requirements are a fact of life on any project, and managing them can take a lot of time and effort. Managing requirements change has been a major challenge even for the best-run projects. Keeping track of how the changing business environment impacts ongoing projects and production applications can be a nightmare without proper tools and techniques.

There is a lot of talk about change and how we should alter the way we do to things at work and in our personal lives in order to be more effective. Sometimes we even hear how it is essential to change even if just for change’s sake. We are pattern-making mechanisms. In general, our system is more comfortable with pattern and routine than with change. Once a pattern is established, our brains will quite happily keep marching along that path. Sometimes we are already at ease on the things we usually do, so think what resistance we have when we try to change patterns that have been part of our lives for years. Some things we usually keep on doing are as simple and straightforward as the route we take into work every day. Some of it is as complex as the way we feel about ourselves.

why it takes longer to develop a utility program?

Before discussing briefly why it takes longer to develop a utility program than an application program and longer still to develop a system program I just want to explain further there differences. Utility program performs a specific task related to the management of computer functions, resources, or files, as password protection, memory management, virus protection, and file compression. Application program is any program designed to perform a specific function directly for the user or, in some cases, for another application program. Application program use the services of the computer’s operating system and other supporting programs.

Why is it that it takes longer to develop a utility program? It is because this program that is designed to perform a particular function. It refers to software that solves narrowly focused problems or those related to computer system management. It functions more composite compared to application program. An application program carries out two types of task: those related to work being performed, such as accepting text or numbers input to a document or spreadsheet, and those related to maintenance chores, such as managing files and displaying information on the screen. These maintenance chores are performed by the computer’s operating system, and an application program interface provides the program with a means of communicating with the system, telling it when system-level task to perform and when.

Many programs come as part of a computer’s operating system, the software that schedules task, allocates data storage, and coordinates data transmission between the computer, connected devices and other computers. From this we can tell that system program has also the longest development time since it is the one who holds the computer and its function.

Friday, January 30, 2009

it doesn't contradict

Question:
Brooks says that adding people to a late project makes it even later (Brooks 1975). Some schedule estimation techniques seem to indicate that adding people to a project can shorten development time. Is this a contradiction? Why or why not?


In the era of business, time management is crucial. Every thing must follow specific schedules or deadlines. When dealing with projects it is much easier to finish it ahead of time to avoid rushing things. The core of the project plan is the project schedule which is used by the project manager to entrust people to the project and show the organization how the work will be performed.

Scheduling techniques doesn’t contradict the idea of Brooks simply because both statements are true. When working with projects we are normally used to work in teams than working by ourselves. That is why the more people who work in a project the more it shorten development time which is usually true by some cases. Why? Because there will be more ideas if there are lots of people working. Sometimes it is better to work on a project with many people on a team than on trying to build a project without any person you can ask for help because it will be much easier to estimate in order to create something that looks like a schedule. Adding people to a project can shorten development time.

On the other hand, adding people to a late project can somehow create tricky situation simply because you still need to orient them the flow of the project. It is also for the reason that each date in the schedule is estimated, and if those dates do not have the agreement of the people who are going to do the work, the schedules will almost certainly be inaccurate. These scenarios are the frequent reasons why some projects are postponed or even canceled.

That is why when working with projects, planning is indeed very important. As we move ahead we are likely to face more complex and difficult challenges. Some of these may involve the coordination of many different people and the completion of many tasks in a precise sequence. In a project and in a real scenario, people working in a plan either numerous number of member or just a small number it can still result to success if and only if the people working in it are competent and willing to complete projects on time. This is why we need to learn how to manage projects well.

its better to buy

Question:

Manny’s Manufacturing must decide whether to build or buy a software package to keep track of its inventory. Manny’s computer experts estimate that it will cost $325m000 to buy the necessary programs. To build the programs in-house, programmers will cost $5,000each per month. What factors should Manny consider in making his decision? When is it better to build? To buy?

Making decision is a matter of life and death. If we want our business to be effective, we need to be able to make good decisions. If we can learn to this in a timely and well considered way, then we can have well-deserved success.

In a business, being practical is a great factor to success. Based on the situation, it is particularly powerful if you have a number of good alternatives to choose from and many different factors to take into account. This makes it a great technique to use in almost any important decision where there isn’t a clear and obvious preferred option.

I think Manny should try getting a list of options and the factors which is need to be considered. Manny should take into consideration the people who will be working if the system will be made in-house and the allotted time to finish the entire program. Since it is not clearly stated if how many peoples are involved in the said projects, we just need to think of the other possible reasons.

When we are referring to big businesses, outsourcing is more illustrious. It is because it improves the quality through contracting out the service with a new service level agreement. They have an access to operational best practice that would be too difficult or time consuming to develop in-house. When big companies outsource their information systems they will have an access to a larger talent pool and a sustainable source of skills. Outsourcing is subcontracting a process. It involves the transfer of the management or day-to-day execution of an entire business function to an external service provider.

Regardless the fact we can minimize the cost if we hire people who will build the software, I would still recommend that Manny will buy software for the main reason that outsourcing offers a lot more.

It is also an ideal tool comparing apples with oranges, such as whether to invest money to buy software of to build it in-house. This makes it easy to choose the most important problem to select that will give the grates advantage